Traffic Count & Analysis
Planning 72-hour CCTV deployments, coordinating station logistics, managing counting teams, QA, Excel analysis, vehicle classification, and QGIS traffic maps.
NEC Registered Civil Engineer - Category A
I support field teams and design offices with disciplined planning, clean technical outputs, GIS-backed analysis, and fast AutoCAD delivery.
About
I have worked across traffic engineering, pavement and road condition assessment, geotechnical investigation, road user satisfaction surveys, and stormwater drainage design. My work combines field planning, team coordination, data processing, QA, mapping, and clean drafting output.
I do not just collect data. I help turn field work into usable engineering information: vehicle-wise traffic datasets, AADT and condition maps, chainage-based distress outputs, borehole field records, structured survey responses, and client-ready drawings.
Expertise
Planning 72-hour CCTV deployments, coordinating station logistics, managing counting teams, QA, Excel analysis, vehicle classification, and QGIS traffic maps.
DGPS-enabled road video capture, chainage processing, distress classification support, spatial validation, condition rating maps, and pavement performance outputs.
Road user satisfaction survey planning, structured public interviews, local stakeholder coordination, government office visits, validation, and reporting support.
Wash boring field support, borehole logging, groundwater table recording, soil sampling, SPT, DCPT, resistivity testing, and equipment mobilization support.
Australian stormwater drafting, architectural cleanup, drainage layouts, catchment plans, OSD drawings, driveway sections, DA/CDC/CC details, and revisions.
QGIS mapping, Google Earth review, DGPS data handling, FFmpeg video workflows, project tracking sheets, AutoCAD 2D drafting, and report-ready data packages.
Project Work
Supported SDI road condition survey workflows across approximately 6,000 km, including DGPS road video processing, chainage burning, distress data export, GIS validation, and condition map support.
Conducted pilot and full-scale road user satisfaction surveys with public interviews and stakeholder coordination.
Led scheduling and coordination for CCTV-based 72-hour counts across 170 stations, plus Western Nepal deployment across 100 stations.
Collected and supported validation of approximately 900 public survey responses for transport reporting.
Assisted field investigations under Nepal Electricity Authority project scope, including wash boring, borehole logs, groundwater, SPT, DCPT, and soil resistivity testing.
Delivered AutoCAD stormwater drawings, OSD plans, catchment plans, markups, revisions, and client-template production drafting.
Working Style
Confirm scope, priority, station routes, project files, templates, or drawing standards before production starts.
Use trackers, client templates, GIS tools, AutoCAD layers, and QA steps so progress stays visible and technical output stays consistent.
Return finalized files, maps, spreadsheets, drawings, survey datasets, or field records with status updates and next-step clarity.
Contact
Send the scope, project files, survey brief, or drawing template. I can help with field planning, technical production, GIS outputs, and AutoCAD drafting.